PRICING · BASEMENT

What your basement budget actually buys.

Every basement is different. Slide through the ranges below to see how scope drives investment — from an open rec room to a rental-ready income suite — then book a 30-minute site assessment for a detailed, fixed-scope quote.

Basement — what each range looks like
Lower investmentHigher investment
Unfinished basement rough-in with concrete floor, exposed studs and joists Basic finished basement rec room with vinyl flooring and exposed duct Standard finished basement with a three-piece bathroom Premium finished basement with a wet bar and built-ins Basement income suite with full kitchen and separate entrance Project-style example — final scope confirmed on site.
Rough-In / Starting Point Where every project begins

Bare basement after demolition — concrete floor, exposed studs, joists, and ductwork. This is the honest starting point we assess on-site before any scope is set.

What can change the final number
Framing + insulation + drywall (per room)$3,000 – $8,000
LVP flooring$4,000 – $9,000
Pot lights + electrical$1,500 – $4,000
3-piece bathroom$8,000 – $15,000
Kitchenette / wet bar$5,000 – $15,000
Egress window$3,000 – $6,000
Trim + doors$1,500 – $4,000
Built-ins$2,000 – $8,000

Typical supply-and-install ranges for the Hamilton area — not a quote. The items found during assessment are confirmed on-site, before any work begins.

Same basement, two ends of the range — drag to compare
Unfinished rough-in basement Premium finished basement with wet bar Rough-in Premium finish

These examples are general visual guides only. Final pricing and scope depend on property condition, ceiling height, moisture and foundation status, material selections, layout complexity, hidden issues, and confirmed project requirements.

TYPICAL TIMELINE
Basement Renovation6–10 weeks
Request Detailed Quote
Explore other project ranges