PRICING · BATHROOM

What your bathroom budget actually buys.

Every bathroom is different. Slide through the ranges below to see how scope drives investment — then book a 30-minute site assessment for a detailed, fixed-scope quote.

Bathroom — what each range looks like
Lower investmentHigher investment
Bathroom rough-in starting point before renovation Refreshed bathroom keeping the existing tub Refreshed bathroom with tub converted to a walk-in shower Standard full bathroom renovation with tiled shower Premium bathroom renovation with frameless glass and upgraded finishes High-end bathroom with double vanity and dual shower heads Fully custom bathroom with freestanding tub and separate double shower Project-style example — final scope confirmed on site.
Rough-In / Starting Point Where every project begins

Bare room after demolition — studs, subfloor, and rough plumbing exposed. This is the honest starting point we assess on-site before any scope is set.

What can change the final number
Vanity + sink$600 – $2,500
Toilet$350 – $900
Bathtub (acrylic / standard)$700 – $2,500
Walk-in shower base + glass$1,500 – $4,500
Wall + floor tile$1,800 – $6,000
Faucets + shower system$300 – $1,200
Quartz vanity countertop$500 – $1,800
Lighting + exhaust fan$300 – $1,000
Heated floor (electric)$800 – $2,500
Paint + finishing$400 – $1,200

Typical supply-and-install ranges for the Hamilton area — not a quote. The items found during demolition are confirmed during the on-site assessment, before any work begins.

Same budget, different priority — drag to compare
Refresh keeping the existing tub Same budget with the tub converted to a walk-in shower Keep the tub Walk-in shower

These examples are general visual guides only. Final pricing and scope depend on property condition, material selections, layout complexity, hidden issues, and confirmed project requirements.

TYPICAL TIMELINE
Bathroom Renovation3–5 weeks
Request Detailed Quote
Explore other project ranges